Colorado Springs sign company & vehicle wrap company
Mon-Fri 8:30-5:00 · By Appointment Only (719) 661-4470
APG: Advanced Printing and Graphics, Colorado Springs sign company
Face Replacement Guide Published September 1, 2026 · 11 min read

Monument Sign Face Replacement Costs

New tenant, same structure. Why refacing usually needs no permit, what the code says about the sign the last occupant left behind, and how to tell whether the existing frame will take a new face at all.

0Permits, when the exemption applies
30Days before abandoned is a nuisance
50%Damage that ends a nonconforming sign
1-2Weeks for non illuminated work
Quick Answer

A monument sign face replacement swaps the visible panel in an existing sign structure without touching the structure itself, which is why it is usually the cheapest way for a new tenant to take over an existing sign. Under Sign Ordinance No. 26-01, face changes, repainting, and re-lamping of previously permitted signage are exempt from permitting, provided the sign is not raised, lowered, removed, or structurally changed. The code also works in your favor here: when a new occupant keeps an existing sign structure, the face is expected to be replaced and kept in good condition. APG produces replacement faces for existing monument signs when the existing structure is suitable, and we do not construct new sign structures. Non illuminated sign work generally runs $2,500 to $10,000, with face replacements usually at the lower end of that range. These ranges are typical and are not project specific estimates.

The structure out front is already permitted, already engineered, and already standing. Almost everything expensive about a ground sign has been paid for by someone else.

That is the whole opportunity in a face replacement. A new business takes a space, the sign at the entrance still carries the last tenant's name, and the assumption is that a new sign means a new project with a permit and a construction schedule. Usually it does not.

To be clear about scope before we go further: APG produces replacement faces for existing monument signs when the existing structure is suitable, and we do not construct new sign structures. This guide is about that work, which is a large share of the ground sign requests we get.

01/10Section

What a Face Replacement Is

Ground signs are assemblies. Understanding which part is which decides what your project actually is.

The parts of an existing ground signOnly one of them changes
Part 01
The structure

Footing, base, masonry or metal surround, and any internal framing. Permitted and engineered when it was built. This stays exactly as it is.

Part 02
The frame and retainer

The opening the face sits in and the trim that holds it. Condition here decides whether a simple replacement is possible.

Part 03
The face

The visible panel carrying the name and graphics. This is the part we produce and install.

Part 04
Illumination

Where the sign is lit, the modules and power supply behind the face. Sometimes fine, sometimes the reason the sign has looked dead for two years.

Two variations we handle often. Some signs take a full replacement panel. Others keep a serviceable existing face and get new graphics applied to it, which is a different and often cheaper job. Which one applies depends on the condition of the panel and how the artwork works.

02/10Section

Why It Usually Needs No Permit

This is the part that saves the most time and money, and it is written directly into the current code.

Sign Ordinance No. 26-01 exempts face changes, repainting, re-lamping, and general maintenance of previously permitted signage from Part 13, so long as the sign is not raised, lowered, removed, or changed in a structural manner. No permit application, no review queue, no waiting.

Two words that carry weight

"Previously permitted." The exemption covers maintenance of a sign that was legally permitted in the first place. It does not legalize a sign that never had one, and it does not cover raising, lowering, relocating, or restructuring. If nobody can confirm the sign's permit history, that is worth checking before ordering a face.

The practical consequence is a timeline most people do not expect. A wall sign project waits on permit review, which in our experience runs two to six weeks from submittal. A face replacement on a properly permitted structure can go from approved estimate to installed in one to two weeks, because the longest step in a normal sign project simply does not apply.

Full context on what does and does not need a permit is in Colorado Springs sign permits after Ordinance 26-01.

03/10Section

The Rule That Pushes New Tenants to Reface

Most businesses treat refacing as optional. The code treats it as closer to expected, and there are three provisions worth knowing.

  1. Abandoned signage becomes a nuisance. A sign no longer in use is abandoned, and after 30 days the code declares it a nuisance, with the Building Official or the Manager able to require the owner to replace or remove it.
  2. A new occupant keeps the structure but replaces the face. Where a new occupant takes over an abandoned sign structure, the expectation is that the face is replaced and kept in good condition.
  3. A noncompliant sign blocks new permits. Separately, a sign permit will not be approved for a new sign on a property where an existing noncompliant sign is standing. So the tired sign at the entrance can hold up the storefront sign you actually want.

Put those together and the sequence for a new tenant becomes clear: deal with the ground sign face early, because it is cheap, fast, exempt from permitting, and it clears the path for everything else.

One more rule for damaged signs

If a sign is legal-nonconforming, meaning it predates current standards, it may stay only if it is not raised, lowered, removed, replaced, structurally altered, or abandoned. If 50 percent or more of the sign area is destroyed, for any reason, it cannot be repaired and has to come down. Hail season makes that a live question here rather than a hypothetical one.

04/10Section

When a Face Can Be Replaced

Not every existing sign takes a new face cleanly. What we look at during review:

  • Retainer and frame condition. The trim that holds the face has to be intact and able to be removed and reinstalled. Corroded or brittle retainers change the job.
  • Structural soundness. Leaning, cracked masonry, rusted framing, or a compromised footing all mean the conversation is about the structure rather than the face, and that is outside our scope.
  • Access. Whether the face comes out from the front or requires disassembly, and whether the location allows a crew and equipment to work safely.
  • Illumination status. Whether the existing lighting works, and what happens behind the new face.
  • Weather sealing. Signs that have been open to water for years often have problems behind the face that only appear once it comes off.

Some sign projects require engineered drawings based on the sign type, size, mounting method, and site conditions. We confirm the applicable requirements as part of the project review.

What we will tell you

If the structure is not suitable, we will say so rather than fitting a new face to a sign that needs more than a face. That is a worse outcome for you than hearing it at the estimate, and it is the kind of thing that surfaces the moment someone actually looks at the sign instead of quoting from a photo.

05/10Section

Face Materials

MaterialBest forNotes
Translucent acrylicIlluminated facesEven light transmission, color matched to brand
PolycarbonateImpact-prone locationsFar more impact resistant than acrylic
Aluminum compositeNon illuminated panelsCommonly rated 10 to 20 years outdoors, stays flat
Applied vinyl graphicsRefreshing a sound existing faceCheapest route when the panel itself is fine

Two Colorado specifics drive these choices. First, at 6,035 feet the ultraviolet load is stronger than at sea level, so any printed or colored face needs UV rated material or laminate, and the difference shows up in year three rather than year one. Second, El Paso County sits in a hail-prone corridor with an active window running roughly April through August, which is a real argument for impact resistance on an exposed ground sign.

Thermal movement matters too. Faces expand and contract with temperature, and one mounted with no room to move will craze or crack at the fasteners. Full material comparison is in acrylic, aluminum or PVC.

06/10Section

Measuring and Fitting

The most common way a face replacement goes wrong is a measurement taken from the wrong place.

The face is not the size of what you can see. It sits inside a retainer, so part of its edge is hidden. A panel cut to the visible dimension will be too small and will not hold in the frame. The measurement that matters is the opening, taken after the retainer is understood, which is why we measure on site rather than working from a tape measure reading over the phone.

What a site visit establishes

  • True face dimensions including the retained edge.
  • Thickness the frame accepts.
  • Whether both sides need faces, since most ground signs are double sided.
  • Condition behind the face, including illumination and any water damage.
  • Whether the artwork should be printed, cut vinyl, or a combination.

Double sided is worth flagging in your budget from the start. Two faces is roughly twice the material and twice the install work, and people routinely price a project in their head as though it were one panel.

07/10Section

What It Costs

Non illuminated commercial sign work generally runs $2,500 to $10,000, and face replacements typically sit at the lower end of that range because the expensive parts of a ground sign already exist. Illuminated sign work runs $8,000 to $15,000 as a full project, though a face swap on a working illuminated structure is a much smaller scope than a new lit sign. These ranges are typical and are not project specific estimates.

What moves a face replacement within its range:

  • Single or double sided. The largest single factor.
  • Face size. Material and handling scale with area.
  • Material and print complexity. A two color cut vinyl layout costs less than full coverage printed artwork.
  • Access and equipment. Reachable from the ground, or does it need a lift.
  • Condition work. Retainer repair, sealing, or lighting issues discovered behind the face.

Compared to the alternative, this is inexpensive. Refacing takes an existing asset and makes it yours. The other path involves the structure, and structures are where the engineering, excavation, and permitting costs live.

08/10Section

Multi-Tenant Panels

Shared ground signs at office parks and centers work the same way, with one added layer: you are one panel in someone else's sign.

  • The landlord usually controls the specification. Panel size, background color, typeface, and sometimes even letter color are set by tenant criteria so the directory stays consistent. Get that document before designing.
  • Panels are modular by design, so a single tenant slot can be produced and swapped without disturbing the others.
  • Shared signage has a paperwork requirement in the code where a permit is involved: an agreement covering ownership and management of the sign, plus the property owner's approval.
  • Match the neighbors. A panel in a different material or finish stands out for the wrong reason, and landlords notice.

If your center's directory has empty slots or faded panels from departed tenants, that is worth raising with the landlord, because unmaintained signage on the property is a problem the code assigns to the property rather than to the vacancy.

09/10Section

Illumination Questions

When the face comes off, whatever is behind it becomes visible, and on an older sign it is often the real story.

Three common findings

  1. The lighting works fine. Best case. New face goes on, the sign lights evenly, done.
  2. The lighting is partially failed. Dark patches or uneven brightness, which will show through a fresh face and undo the point of the project.
  3. The lighting has been dead for years, and the business had assumed the sign was never lit.

Where illumination work is needed, the scope, the electrical requirements, and any inspection obligations get confirmed as part of the project review. Re-lamping an existing permitted sign falls within the same maintenance exemption as a face change, but electrical work carries its own requirements through Pikes Peak Regional Building Department.

One more code point worth knowing: a static illuminated face is not an electronic message center. Digital displays that change messages are a separate sign type with limits on area, brightness, hold time, and quantity, covered in LED and electronic message center rules.

10/10Section

Process and Timeline

One to two weeks is typical for non illuminated work once artwork is approved, which makes this one of the fastest exterior sign projects available.

  1. Site visit. We measure the opening, assess the retainer and structure, and look behind the face where possible.
  2. Estimate, including whether the project is a new face or new graphics on the existing one.
  3. Design and proofing. Once the estimate is approved and the deposit is received, our team will begin the design and proofing process.
  4. Production, then installation, usually in a single visit.

What to have ready

Photos of the sign from the front and from an angle, the property address, your logo files in vector format, the landlord's tenant criteria if it is a shared sign, and anything you know about the sign's permit history.

If the ground sign is part of a larger first signage package, the sequencing matters. Our guide to storefront signage cost for a new business covers the whole order of operations from lease signing to opening day.

Key Takeaways

The Short Version

  • A face replacement swaps the visible panel in an existing structure, so the expensive parts of a ground sign are already paid for.
  • Face changes, repainting, and re-lamping of previously permitted signage are exempt from permitting, provided nothing is raised, lowered, removed, or structurally changed.
  • That exemption removes permit review, which is normally the longest step, so a reface can go from approved estimate to installed in one to two weeks.
  • An abandoned sign becomes a nuisance after 30 days, and a new occupant taking over a structure is expected to replace the face and keep it in good condition.
  • A noncompliant sign on the property blocks new sign permits, so the tired ground sign can hold up the storefront sign you actually want.
  • Measure the opening rather than the visible panel, since part of the face is hidden by the retainer, and remember most ground signs are double sided.
  • APG produces replacement faces for existing monument signs when the existing structure is suitable, and does not construct new sign structures.
Sources and references

Where this information comes from

  1. City of Colorado Springs Unified Development Code, Chapter 7, Article 4, Part 13 (Signs), as adopted by Sign Ordinance No. 26-01, February 2026. Exemptions for face changes and maintenance of previously permitted signage, permit approval conditions, and provisions covering nonconforming and abandoned signs.
  2. Pikes Peak Regional Building Department requirements for electrical work on illuminated signage.
  3. Published substrate data for acrylic, polycarbonate, and aluminum composite sign faces, including outdoor durability and thermal movement.
  4. APG estimate, fabrication, and installation records, Colorado Springs office. Ranges reflect typical 2026 pricing and are not project specific estimates.

Code summaries here are general information rather than legal advice. The city is the final authority on any specific property.

Common questions

Face Replacement FAQ

Do I need a permit to replace a sign face?

Generally no. Face changes, repainting, re-lamping, and general maintenance of previously permitted signage are exempt under the current Colorado Springs sign code, provided the sign is not raised, lowered, removed, or changed in a structural manner. The exemption applies to signs that were legally permitted in the first place.

How much does a sign face replacement cost?

Non illuminated commercial sign work generally runs $2,500 to $10,000, and face replacements typically sit at the lower end because the structure already exists. Single versus double sided is the largest cost factor, followed by face size, material, print complexity, and access. These ranges are typical and are not project specific estimates.

Does APG build new monument signs?

APG produces replacement faces for existing monument signs when the existing structure is suitable, and does not construct new sign structures. If a project needs a new structure, we will say so at the review rather than partway through.

The previous tenant's name is still on the sign. Do I have to change it?

Practically, yes. A sign no longer in use is abandoned, and after 30 days the code treats it as a nuisance, with the city able to require the owner to replace or remove it. Where a new occupant takes over the structure, the face is expected to be replaced and kept in good condition.

How long does a face replacement take?

One to two weeks is typical for non illuminated work once artwork is approved. Because the maintenance exemption removes permit review, which is normally the longest step in a sign project, refacing is one of the fastest exterior sign options available.

How is a sign face measured?

By the opening, not by what you can see. The face sits inside a retainer that hides part of its edge, so a panel cut to the visible dimension will be too small to hold in the frame. That is why measurements are taken on site rather than over the phone.

What if the sign lighting does not work?

It usually becomes visible when the face comes off. Partially failed lighting will show through a new face as dark patches, undoing the point of the project. Where illumination work is needed, the scope and electrical requirements are confirmed as part of the project review, since electrical work carries its own requirements through Pikes Peak Regional Building Department.

What material should a sign face be?

Translucent acrylic for illuminated faces because it transmits light evenly, polycarbonate where impact resistance matters, and aluminum composite for non illuminated panels. Where the existing panel is sound, applied vinyl graphics can refresh it for less than a full replacement.

Can a damaged sign always be repaired?

Not always. A legal-nonconforming sign may remain only if it is not raised, lowered, removed, replaced, structurally altered, or abandoned, and if 50 percent or more of the sign area is destroyed for any reason it cannot be repaired and must be removed. Hail damage makes that a real question in this region.

What about a tenant panel in a shared directory sign?

Panels are modular, so a single tenant slot can be produced and swapped without disturbing the others. The landlord's tenant criteria usually specify panel size, background color, and typeface, so get that document before designing. Shared signage also has paperwork requirements where a permit is involved.

APG: Advanced Printing and Graphics
APG: Advanced Printing and Graphics
Prepared by the APG Content Team · Reviewed for accuracy by Chris Tombaugh, Founder

APG: Advanced Printing and Graphics provides vehicle wraps, commercial signage, printing, apparel, promotional products, branding, and graphic design. APG is backed by industry experience dating to 2002 and has completed more than 3,000 projects and 1,000 installations. Our experience includes work for Colorado businesses and national brands such as Nike, Wells Fargo, Redken, and Warner Bros. APG was named a 2026 Best of the Springs winner in the design category by The Gazette and is a 2026 Best in Business finalist for outdoor marketing solutions with the Southern Colorado Business Journal.

Request a Free Estimate

Fast, and usually permit free.

Put Your Name on the Sign Out Front.

Send photos of the sign from the front and from an angle, the property address, and your logo files. Our team will confirm whether the structure takes a new face and send an estimate. Once the estimate is approved and the deposit is received, our team will begin the design and proofing process.